liya

For the establishment of a CNG cylinders production line and appropriate arrangement of the machinery, we needed to have a steel structure building of minimum 22000 m2 area. By the approval of the main shareholders and the enactment of the board of directors, the company decided to purchase a 40000 m2 piece of land to accommodate its production line, raw material storage, primary warehouse, administrative and ancillary buildings, laboratory, Etc. 

 

By the support of Qazvin’s governor, the province’s organization of industries, the province’s economic and non-economic institutions and also the province’s Industrial Estate Company, ANCC purchased from Qazvin Industrial Estate Company a piece of land of 40000 m2 in one of the strategically best areas of Lia Industrial Zone which was absolutely reliable regarding security matters and was located across from an electricity post.

 

The main building is a 294*72*24 (in meters) steel structure with 3 gates of 24 meters each and 50 portal frames with 6 meter distance between each two. The building’s roof is 20% sloped.

 

The middle gate is equipped with a 20 ton crane and the two other with 5 and 10 ton ones.

 

Side load resistance system of the building is implemented by normal shaped steel bending along axis X and simple structure with bracing along axis Y.

 

Since the building is a symmetric and height-level steel structure, according to Regulation 2008- 3rd edition, tap-foundation with concrete ties have been implemented for the distribution of earthquake side load by the equivalent static load approach.

 

For the establishment of a CNG cylinders production line and appropriate arrangement of the machinery, we needed to have a steel structure building of minimum 22000 m2 area. By the approval of the main shareholders and the enactment of the board of directors, the company decided to purchase a 40000 m2 piece of land to accommodate its production line, raw material storage, primary warehouse, administrative and ancillary buildings, laboratory, Etc.  By the support of Qazvin’s governor, the province’s organization of industries, the province’s economic and non-economic institutions and also the province’s Industrial Estate Company, ANCC purchased from Qazvin Industrial Estate Company a piece of land of 40000 m2 in one of the strategically best areas of Lia Industrial Zone which was absolutely reliable regarding security matters and was located across from an electricity post. The main building is a 294*72*24 (in meters) steel structure with 3 gates of 24 meters each and 50 portal frames with 6 meter distance between each two. The building’s roof is 20% sloped. The middle gate is equipped with a 20 ton crane and the two other with 5 and 10 ton ones. Side load resistance system of the building is implemented by normal shaped steel bending along axis X and simple structure with bracing along axis Y. Since the building is a symmetric and height-level steel structure, according to Regulation 2008- 3rd edition, tap-foundation with concrete ties have been implemented for the distribution of earthquake side load by the equivalent static load approach.

History

  • Written by admin
  • Category: ASIA NAMA
  • Hits: 1774

With more than one third of a century experience in manufacturing stationary accessories for both local and neighboring markets, in 2006, Asia Nama authorities began to consider the high rate of air pollution throughout the country, lack of adequate fuel supply for vehicles and the national plan for modifying 10 million cars to “bi-fuel engines” in a 5 year period. They had a thorough local and national market analysis and a series of scientific and industrial researches accomplished before they made decision within the due development plan framework to change the company’s field of activity and start to manufacture compressed natural gas cylinders.

A competent research team was assigned to collect the required information related to the production procedures. Eventually, on the basis of inclusive market analyses in Iran and the neighboring countries, the company’s outstanding local and foreign engineers and consultants made conclusion to start with the production of type 1 cylinders by the use of steel sheets, provided that the development plan will include the production of type 2 and 3 cylinders as well.

By putting an endless effort into the project, Asia Nama group managed to achieve the state-of-the-art technical knowledge of the industry. As a result, the company’s plan was selected as the best industrial plan of the year by the Ministry of Mine and Industries and the Bureau of Note #13 of the Budget Law. The plan is still being referred to by other companies as a valid reference document in the ministry.

As the largest producer of preform and CNG cylinders in the Islamic Republic of Iran and throughout the region, Asian Nama Industrial Group has invested €50m in manufacturing CNG cylinders in compliance with ISO 11439 Standard, holding up to a bi-dimensional humanitarian and economic insight upon the industry.

In order to achieve the highest quality product and increase the competitive potentials against the biggest European manufacturers, the company has purchased its most advanced hi-tech equipment from Germany and partially from South Korea. This manufacturing plant enjoys the highest technology of CNG industry and is certified by TUV Germany.

namalogo

Contact Us

ASIA NAMA CNG CYLINDERS MFG. GROUP

  • Head Office : NO 18,NO 23 ALLEY, Gandi AVE, Tehran, IRAN
  • (21) 8866 3272-4
  • (21) 8866 3176
  • Factory: SANATGARAN BLV, LIA INDUSTRIAL ZONE, Qazvin , IRAN
  • (28) 3345 4875
  • (28) 3345 4874
  • (28) 3345 4900
  • (28) 3345 4902
  • (28) 3345 4870
  • (28) 3345 4872
  • FAX: (28) 3345 4873
  • info@namacng.ir

gandi

مجوز استفاده از قالب عمومی خلیلان هاستینگ براي اين دامنه داده نشده , برای دریافت مجوز قالب بر روی لینک ، ( درخواست مجوز ) کلیک کنید