Lia Plant

User Rating: 4 / 5

Star ActiveStar ActiveStar ActiveStar ActiveStar Inactive
 

liya

For the establishment of a CNG cylinders production line and appropriate arrangement of the machinery, we needed to have a steel structure building of minimum 22000 m2 area. By the approval of the main shareholders and the enactment of the board of directors, the company decided to purchase a 40000 m2 piece of land to accommodate its production line, raw material storage, primary warehouse, administrative and ancillary buildings, laboratory, Etc. 

 

 

 

By the support of Qazvin’s governor, the province’s organization of industries, the province’s economic and non-economic institutions and also the province’s Industrial Estate Company, ANCC purchased from Qazvin Industrial Estate Company a piece of land of 40000 m2 in one of the strategically best areas of Lia Industrial Zone which was absolutely reliable regarding security matters and was located across from an electricity post.

 

 

 

The main building is a 294*72*24 (in meters) steel structure with 3 gates of 24 meters each and 50 portal frames with 6 meter distance between each two. The building’s roof is 20% sloped.

 

 

 

The middle gate is equipped with a 20 ton crane and the two other with 5 and 10 ton ones.

 

 

 

Side load resistance system of the building is implemented by normal shaped steel bending along axis X and simple structure with bracing along axis Y.

 

 

 

Since the building is a symmetric and height-level steel structure, according to Regulation 2008- 3rd edition, tap-foundation with concrete ties have been implemented for the distribution of earthquake side load by the equivalent static load approach.

 

 

For the establishment of a CNG cylinders production line and appropriate arrangement of the machinery, we needed to have a steel structure building of minimum 22000 m2 area. By the approval of the main shareholders and the enactment of the board of directors, the company decided to purchase a 40000 m2 piece of land to accommodate its production line, raw material storage, primary warehouse, administrative and ancillary buildings, laboratory, Etc.  By the support of Qazvin’s governor, the province’s organization of industries, the province’s economic and non-economic institutions and also the province’s Industrial Estate Company, ANCC purchased from Qazvin Industrial Estate Company a piece of land of 40000 m2 in one of the strategically best areas of Lia Industrial Zone which was absolutely reliable regarding security matters and was located across from an electricity post. The main building is a 294*72*24 (in meters) steel structure with 3 gates of 24 meters each and 50 portal frames with 6 meter distance between each two. The building’s roof is 20% sloped. The middle gate is equipped with a 20 ton crane and the two other with 5 and 10 ton ones. Side load resistance system of the building is implemented by normal shaped steel bending along axis X and simple structure with bracing along axis Y. Since the building is a symmetric and height-level steel structure, according to Regulation 2008- 3rd edition, tap-foundation with concrete ties have been implemented for the distribution of earthquake side load by the equivalent static load approach.